BOSTIK - DALTON
Just finished in time for christmas a New extension built up of a steel frame and double skin cladding in olive green with 10% GRP roof lights. our client now has double the working/ storage space they had before.
we have also completed a canopy enclosure fixing our new frame to the existing steelwork and cladding in single skin olive green.
UNIT 197 - WETHERBY INDUSTRIAL ESTATE
This exisitng building has had its 2500m2 roof stripped of asbestos and a new double skin built up metal roof fitted with 20% GRP roof lights.
The front elevation was also Re Clad with horizontal and vertical metallic silver cladding and new gutters all round. (Visit our Cladding gallery to see its finished look)
GBuk - Blackwood hall Business Park, York.
We have recently supplied and erected a new steel portal frame building to accommodate further expansion for GBuk Limited a medical supplies company based at Blackwood Hall Business Park. The building measured 21.500m wide x 102m long in 17 equal bays at 6.000m each . The eaves hieght was 10m. The building was clad in Kingspan Composite Panels.
OTHER RECENT CONTRACTS
Collett Transport - Halifax - We have recently completed major roof replacement works. Two existing sheds covering 4000m2 have had the uninsulated asbestos cladding stripped and removed. The new rood fixed was a double skin built up metal roof. All gutters were also replaced.
Cod Beck Blenders -
Thorp Arch Estate - We have just completed a new roof to an exisitng retail unit.